In August 2026, the Merwestein Sports and Events Complex in Nieuwegein reopened following a renovation and sustainability upgrade that lasted nearly 2.5 years. The renovated sports complex features a double sports hall nearly 89 meters deep, equipped with Pulastic sports flooring. The hall can easily be divided into five separate sections. The swimming pool, locker rooms, and other facilities have also been renovated.

 

Automated maintenance was included in the plan

Veiligesportvloer is supplying the fully automatic RA660Navi XL for cleaning both sports halls. This robot cleans the sports floors at night, when the halls are not in use. For the bleachers and locker rooms, Merwestein uses the Toro Cas. The Excentr Daily 55-60 cleans the wet areas and the walkways around the pool.

 

Smart design means thinking ahead

Using a robot efficiently requires more than just the right machine. Where will the robot be parked when it’s not in operation? Where will the charging station be located? And does the robot have enough space to maneuver? By considering these questions early in the design phase, you can avoid having to make adjustments later on and create the right conditions for efficient, automated maintenance.

Thank you, Merwestein Event Complex, for placing your trust in Veiligesportvloer. We wish you every success with the new complex and the use of the equipment!

robot charging station in a sports hall